Morning <div><br></div><div>I&#39;m curious if anyone has studied the time taken to morn &amp; finalize a weak object. I ask this because in my past work with VW and VA the most interesting GC issues I tackled related to how much time finalization took versus how long the engineer thought it might take.  </div><div><br></div><div>Thought on this should relate to normal processing, or situations where the engineer is trying to force the finalization via interaction with the GC logic. </div><div><br></div><div><br></div><div><br><br>On Thursday, 26 May 2016, Eliot Miranda &lt;<a href="mailto:eliot.miranda@gmail.com">eliot.miranda@gmail.com</a>&gt; wrote:<br><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex"> </blockquote></div><br><br>-- <br><div dir="ltr"><div><div dir="ltr">===========================================================================<br>John M. McIntosh. Corporate Smalltalk Consulting Ltd <a href="https://www.linkedin.com/in/smalltalk" target="_blank">https://www.linkedin.com/in/smalltalk</a><br>===========================================================================<br></div></div></div><br>