I personally think that the initial confusion comes from the fact that we
name a GregorianDate as Date. Once that is made explicit there is no
surprise in writing:
GregorianDate julianDayNumber: 0
and obtain
24 November -4713 (GregorianDate)
instead of
1 January -4712 (JulianDate)

In my little Calendrica project I made that distinction explicit but the
implicit convention of understanding Date being GregorianDate is equally
valid.
It just needs a little bit more of text in the class comment.

HTH
Ciao
On Jun 26, 2012 10:39 PM, "David T. Lewis" <lewis at mail.msen.com> wrote:

> Hi Enrico,
>
> The Chronology package in Squeak takes a simple point of view in that only
> one calender algorithm is in effect. Based on your experience with this
> topic, would you say that the algorithm that Bert has proposed is a good
> choice?
>
> It seems to me that it is an improvement because it produces the expected
> results for a wide range of users, and it does not break any existing
> assumptions in the system.
>
> Thanks
> Dave
>
> On Tue, Jun 26, 2012 at 10:18:56PM +0200, Enrico Spinielli wrote:
> > If you need to calculates dates in different calendars, the reference is
> > Nachum Dershowitz, Edward M. Reingold  'Calendrical Calculations' [1].
> > But beware of what you mean with 'historical' conversions: Gregorian
> > calendar was adopted at different times in different countries...
> >
> > I have a literate programming based implementation in Python (an original
> > Lisp code of tge book side by side) at [2].
> >
> > A Smaltalk implenentation is available at [3].
> >
> > HTH
> > Bye
> > Enrico
> >
> > [1]
> >
> http://emr.cs.iit.edu/home/reingold/calendar-book/third-edition/index.html
> > [2] http://code.google.com/p/pycalcal/
> > [3] http://www.squeaksource.com/Calendrica.html
> > On Jun 26, 2012 7:07 PM, "H. Hirzel" <hannes.hirzel at gmail.com> wrote:
> >
> > > Great that Squeak will be in the position to calculate historical
> > > dates properly, so no objection at all.
> > >
> > > Thank you for your careful analysis and a synthesis of an algorithm
> > > which corrects the problem. I assume you description will be in a
> > > class comment...
> > >
> > > Hannes
> > >
> > > On 6/25/12, David T. Lewis <lewis at mail.msen.com> wrote:
> > > > On Mon, Jun 25, 2012 at 01:54:08PM +0200, Bert Freudenberg wrote:
> > > >> Squeak dates are based on the Julian Day Number:
> > > >>
> > > >>      http://en.wikipedia.org/wiki/Julian_day
> > > >>
> > > >> This is defined as the number of days since January 1, 4713 BC in
> the
> > > >> Julian proleptic calendar.
> > > >>
> > > >> Now, to my surprise,
> > > >>
> > > >>      Date julianDayNumber: 0
> > > >>
> > > >> answers
> > > >>
> > > >>      24 November -4713
> > > >>
> > > >> instead of
> > > >>
> > > >>      1 January -4712
> > > >>
> > > >> Digging into this it is because Squeak uses the Fliegel-Van Flandern
> > > >> algorithm, which always results in a Gregorian date. Even for dates
> > > before
> > > >> the Gregorian calendar was introduced. If we were to use the
> algorithm
> > > by
> > > >> Jean Meeus, dates before 15 Nov 1582 would be converted to a Julian
> > > date.
> > > >>
> > > >> Meeus is a floating point algorithm which we may not want to use. I
> > > added
> > > >> a correction to our method similar to Meeus, but converted to
> integers.
> > > So
> > > >> this is a mixed one, pasted below.
> > > >>
> > > >> Would anyone be opposed to adopt this? The behavior will be
> unchanged
> > > for
> > > >> all dates more recent than 15 Nov 1582.
> > > >
> > > > I can't think of any reason why this should cause problems, aside
> from
> > > the
> > > > need to make a couple of trivial updates to the unit tests. Perhaps
> Brent
> > > > can comment, but it looks to me like a good thing to do.
> > > >
> > > > Dave
> > > >
> > > >
> > > >>
> > > >> If so, we also would need an adjustment for the reverse part in
> > > >> year:month:day:hour:minute:second:nanoSecond:offset:. This is
> already
> > > >> covered by a test using the year 1200 BC
> > > >> (DateAndTimeTest>>testFromString). Anybody up for making that work?
> > > >>
> > > >> I stumbled upon this because Etoys 5 has a new Calendar object which
> > > >> exposes the Julian Day Number, and setting it to 0 is a very
> convenient
> > > >> way of explaining what that means.
> > > >>
> > > >> Thanks!
> > > >>
> > > >> - Bert -
> > > >>
> > > >> dayMonthYearDo: aBlock
> > > >>      "Evaluate the block with three arguments: day month, year.
> > > >>      Uses the Fliegel-Van Flandern algorithm, with adjustment for
> dates
> > > before
> > > >> 15 Nov 1582 as given by Jean Meeus.
> > > >>      See http://mathforum.org/library/drmath/view/51907.html"
> > > >>
> > > >>      | a l n i j dd mm yyyy |
> > > >>      a := jdn.
> > > >>      a < 2299161 ifTrue: [ | alpha |
> > > >>              alpha := (jdn * 4 - 7468865) // 146097.
> > > >>              a := jdn - 1 - alpha + (alpha // 4)].
> > > >>      l := a + 68569.
> > > >>      n := 4 * l // 146097.
> > > >>      l := l - (146097 * n + 3 // 4).
> > > >>      i := 4000 * (l + 1) // 1461001.
> > > >>      l := l - (1461 * i // 4) + 31.
> > > >>      j := 80 * l // 2447.
> > > >>      dd := l - (2447 * j // 80).
> > > >>      l := j // 11.
> > > >>      mm := j + 2 - (12 * l).
> > > >>      yyyy := 100 * (n - 49) + i + l.
> > > >>
> > > >>      ^ aBlock
> > > >>              value: dd
> > > >>              value: mm
> > > >>              value: yyyy
> > > >>
> > > >
> > > >
> > >
> > >
>
> >
>
>
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://lists.squeakfoundation.org/pipermail/squeak-dev/attachments/20120627/df17af05/attachment-0001.htm


More information about the Squeak-dev mailing list