[Vm-dev] Ephemerons and VM crash
John McIntosh
johnmci at smalltalkconsulting.com
Sat May 28 17:14:30 UTC 2016
Morning
I'm curious if anyone has studied the time taken to morn & finalize a weak
object. I ask this because in my past work with VW and VA the most
interesting GC issues I tackled related to how much time finalization took
versus how long the engineer thought it might take.
Thought on this should relate to normal processing, or situations where the
engineer is trying to force the finalization via interaction with the GC
logic.
On Thursday, 26 May 2016, Eliot Miranda <eliot.miranda at gmail.com> wrote:
>
--
===========================================================================
John M. McIntosh. Corporate Smalltalk Consulting Ltd
https://www.linkedin.com/in/smalltalk
===========================================================================
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://lists.squeakfoundation.org/pipermail/vm-dev/attachments/20160528/2a36a03b/attachment.htm
More information about the Vm-dev
mailing list