[Seaside-dev] Seaside 3.0b1 release schedule

John O'Keefe wembley.instantiations at gmail.com
Fri Sep 18 18:44:59 UTC 2009


VA Smalltalk is in the same position (as you might remember from my
presentation at ESUG).  I said then that we would deliver V8.0.1 in October
with Seaside 3.0b1.  Of course this means the end of October, but this
translates into 'feature-complete' by the first week of October.  I suspect
I have a little more flexibility in my dates than the VW folks since V8.0.1
is just a refresh/fix roll-up release, but I would like it to include
Seaside 3.0b1 if possible and I can/will push my dates to the right a
little, but not a lot, to accommodate the Seaside schedule.
I'm aware of how much a volunteer effort Seaside is, and how this makes
schedules hard to predict, so I understand that the answer most likely is
'it will be ready when it is ready'.

Regards,  John
John O'Keefe [|], Principal Smalltalk Architect, Instantiations Inc.


On Fri, Sep 18, 2009 at 2:32 PM, Michael Lucas-Smith <
mlucas-smith at cincom.com> wrote:

> Hi All,
>
> VisualWorks 7.7 is approaching a release candidate period. I need to
> include Seaside 3.0 in to the builds soon, but I'd *really* like to say "VW
> 7.7 includes Seaside 3.0b1". I can only do that if b1 is released before I
> get frozen out of the 7.7 release process completely.
>
> The alternative is, I release something that's "not quite 3.0b1" which
> isn't ideal.
>
> I'm expecting the release candidates to begin in the next two weeks - is
> there any chance we'll have 3.0b1 ready before then?
>
> Cheers,
> Michael
> _______________________________________________
> seaside-dev mailing list
> seaside-dev at lists.squeakfoundation.org
> http://lists.squeakfoundation.org/mailman/listinfo/seaside-dev
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://lists.squeakfoundation.org/pipermail/seaside-dev/attachments/20090918/b1ee309e/attachment.htm


More information about the seaside-dev mailing list