On Mar 26, 2008, at 15:38 , Hilaire Fernandes wrote:
2008/3/26, Bert Freudenberg bert@freudenbergs.de:
On Mar 26, 2008, at 15:02 , Bryan Berry wrote:
In general, Etoys-based activities start pretty quickly but take a long time to shutdown, literally 2 minutes. This is an issue our team in Nepal is wrestling w/. Hopefully we will come up w/ a solution that can be shared. I should ask Hilaire for help w/ this.
What takes long is the project saving to the Journal. If you do not need that - take it out, and quitting will be instantaneous.
Why saving in the journal is so long?
Saving a project is not optimized for speed. The checking into the datastore only adds a bit of overhead I think, although I did not actually measure it.
- Bert -